Bellevue

Stormwater Management

The Envirolok systems was installed as a means of  restoring and protecting a large roadside stormwater drain. In order to divert water during construction, a temporary culvert was placed in the channel.  Upon establishment of the hydroseed and plant plugs the culvert was removed.  The vegetated wall now provides a stable bank able to withstand routine flooding in heavy storm events