Mill Creek

Stormwater Channel

This project truly reflects the versatility and adaptability of the Envirolok system in stormwater management. Envirolok was used to stabilize the slopes and vegetated with live stakes to create aesthetic side slopes for the drainage channel. The bags were also laid down at the bottom of the channel to protect the bottom of the channel from erosion during severe storm events.  The result is a lush green, sustainable and sturdy stormwater management system.